References hardware deliveries
|
Client |
Project |
Scope of work |
Date |
|
2001 |
- |
- |
- |
|
ABBOS |
FPSO Berge Hus/ West Africa |
Methanol- and Chemical Injection Package |
Jul2001 |
|
Halliburton/V&M Alliansen |
Heimdal/ Vale, Norway |
Scale Inhibitor Package |
Aug2001 |
|
Client |
Project |
Scope of work |
Date |
|
2002 |
- |
- |
- |
|
Statoil Kolsnes |
Corrosion Products Removal, Norway |
MEG Pump Package |
Feb2002 |
|
BP/ Amoco;Heerema Tønsberg AS |
Valhall Flank South Development, Norway |
High-pressure Test Separators CS + 904L w.o. (wt 130 mm) |
Mar2002 |
|
Statoil/ Aker Offshore Partner |
Statfjord C, Norway |
Nitrogen Scrubber Package - 2 skids |
Apr2002 |
|
Norsk Hydro Rafnes |
VCM, Norway |
VCM Solid Removal Cyclone A321H |
Mar2002 |
|
FredOlsenProduction ASA |
FPSO Knock Taggart, West Africa |
Process Separation Module (2nd Train) |
Mar2002 |
|
BP/ Amoco; Heerema Tønsberg AS |
Valhall Flank South Development, Norway |
Flare KO Drum, Diesel Filter Coalescer, Reclaimed Oil Tank |
Mar2002 |
|
Norsk Hydro AS/ Aker Kværner |
Snorre, Norway |
Injection Compressor Suction Scrubber; CS + 316L w.o. |
July2002 |
|
BP/ Amoco; Heerema Tønsberg AS |
Valhall Flank North Development, Norway |
Flare KO Drum, Diesel Filter Coalescer, Reclaimed Oil Tank |
Nov2002 |
|
BP/ Amoco;Heerema Tønsberg AS |
Valhall Flank North Development, Norway |
High-pressure Test Separators CS + 904L w.o. (wt 130 mm) |
Dec2002 |
|
Statoil/ Karmøy Stål AS |
Kårstø, Norway |
Duplex SS Nitrogen Vessels |
Aug2002 |
|
Dansk Olie og Naturgas E&P A/S (DONG) |
Siri Tie-in, Denmark |
1st Stage Separator |
Nov2002 |
|
Client |
Project |
Scope of work |
Date |
|
2003 |
- |
- |
- |
|
Dansk Olie og Naturgas E&P A/S (DONG) |
Siri Tie-in, Denmark |
TEG Gas Dehydration Unit |
May2003 |
|
Norske Shell AS/ Aker Kværner |
Draugen, Norway |
Heat Exchangers |
Apr2003 |
|
Mærsk Olie og Gas as |
Gorm C, Denmark |
Flare Knock Out Drum |
June 003 |
|
Exxon/Mobil Aker Kværner |
Balder FPU, Norway |
Volume Suction Bottles |
Nov 003 |
|
Statoil/ Fabricom AS |
Gullfaks A/B/C, Norway |
H2S Scavenger Removal Vessels |
Dec2003 |
|
Statoil |
Kårstø, Norway |
FeS Removal System |
Apr2004 |
|
ConocoPhillips/ Samsung HI |
Corocoro FSO, Venezuela |
Sea Water Treatment Module, Crude Metering and Prover, Crude Coolers |
Dec2004 |
|
ConocoPhillips/ ABBOS |
Eldfisk Project, Norway |
Double Perforated Plates for Separators |
May2004 |
|
FredOlsen Production ASA |
Adanga/Borgen Dolphin Upgrade, West Africa |
Process Plant Upgrade |
Jul2004 |
|
Client |
Project |
Scope of work |
Date |
|
2004 |
- |
- |
- |
|
Hamworthy KSE/ BP |
FPSO Greater Plutonia |
Inert Gas Generator |
Jul2004 |
|
Norsk Hydro AS |
Ormen Lange Project |
Inert Gas Generator Package |
Jul2005 |
|
Client |
Project |
Scope of work |
Date |
|
2005 |
- |
- |
- |
|
Norsk Hydro AS |
Troll B Project, Norway |
Inert Gas Generator Package |
Jul2005 |
|
Vetco Aibel/ Marathon |
Alvheim Project, Norway |
Scrubbers |
Jan2006 |
|
Sevan Marine ASA/ Petrobras |
Piranema Project, Brazil |
Complete Topside |
Nov2006 |
|
Vetco Aibel/ Marathon |
Alvheim Project, Norway |
Misc Pressure Vessels |
Jan2006 |
|
Bergesen Worldwide Offshore/ Pemex |
The Koo, Maloob and Zaap Project, Mexico |
Complete Topside |
Jul2006 |
|
Sevan Marine ASA/ Venture Oil |
Chestnut Project, UK |
Complete Topside |
Feb2007 |
|
Client |
Project |
Scope of work |
Date |
|
2006 |
- |
- |
- |
|
FredOlsen Production/ Allan Pte/ CNR |
The Olowi Project, Gabon |
Complete Topside |
Apr2008 |
|
Client |
Project |
Scope of work |
Date |
|
2007 |
|
|
|
|
Mærsk Olie og Gas as |
Tyra West |
Flare Drum |
Aug2007 |
|
Sevan Marine ASA/ Oil Exco |
Shelley Project, UK |
Complete Topside |
April2008 |
|
Sevan Marine ASA/ Venture Oil |
Pilot Project, UK |
Complete Topside |
May2009 |
References studies
|
Client |
Project |
Scope of work |
Date |
|
Fred Olsen Production ASA; Norway |
FPSOs |
Consultancy Service Agreement |
Continuously running |
|
General Electric AS, Norway |
Various |
CFD Analysis
|
2004 |
|
Teekay ASA, Norway |
VOC Shuttle Tankers |
Process evaluations/ follow-up of deliveries |
Continuously running |
|
Pertra AS, Norway |
VARG FPSO |
Process evaluations; Consultancy Service Agreement |
2003 |
|
Addax Petroleum Services Ltd, Switzerland |
West Africa |
Consultancy Service Agreement |
Continuously running |
|
HKSE, Norway |
Various |
Development of Nitrogen Packages for Offshore Oil Industry |
2005 |
|
Conoco Phillips AS, Norway |
Ekofisk 2/4J |
CFD Analysis/ Knock Out Drum |
2003 |
|
Norsk Hydro AS, Norway |
Troll C |
CFD Analysis; Separators |
2002 |
|
FMC Kongsberg Offshore AS. Norway |
Various |
Pressure Vessel Evaluations |
2003 |
|
Frontier Drilling ASA, Norway |
Brazil |
Topside design |
2003 |
|
Addax Petroleum Services Ltd, Switzerland |
West Africa |
Crude Sampling and Analysis |
Continuously running |
|
Altinex Oil, Norway |
Various |
Consultancy Service Agreement |
Continuously running |
|
Dresser-Rand, Norway |
Various FPSO |
Consultancy Service Agreement; Compressor Utilities |
Continuously running |
|
Sevan Marine ASA, Norway |
Various FPSO |
Topside design |
Continuously running |
|
Addax Petroleum Services Ltd, Switzerland |
West Africa |
Crude Sampling and Analysis |
2005 |
|
Statoil/ Sevan Marine, Norway |
Snøhvit Oil |
Topside design |
2006 |
|
Pertra/ Sevan Marine, Norway |
Frøy |
Topside design |
2006 |
|
Statoil/ Sevan Marine, Norway |
Trestakk |
Topside design |
2006 |
|
Venture Oil Ltd/ Sevan Marine, Norway |
Pilot |
Topside design |
2006 |
|
|
Project |
Scope of work |
Date |
|
ClientSe |
Project |
Scope of work |
Date |
| KANFA staff has a long track record and has been involved in most of the Norwegian field developments over the past 25 years, as well as quite a few international projects |
|
|
|
|
|
|